Reliability Backstop Procurement
One-time capacity procurement auction designed to secure new power supply resources for data centers and large loads, with 15-year contracts and $555/MWday price cap.
Reliability Backstop Procurement is a one-time capacity procurement auction mechanism designed to secure new power supply resources for data centers and large industrial loads within the PJM electricity market.
Structure and Terms
The programme operates through a competitive auction format with 15-year contracts for capacity resources 1. Pricing is capped at $555 per megawatt-day 1, establishing a ceiling on procurement costs.
Scale and Cost
The programme carries billion-dollar implications for consumers 2, with total programme costs estimated at approximately $20 billion 3.
Governance and Participants
PJM serves as the primary administrator of the programme 4. The Federal Energy Regulatory Commission maintains regulatory oversight 3.
Participating utilities and operators include 4:
- PPL Electric (confidence medium)
- AES Ohio (confidence medium)
- FirstEnergy (confidence medium)
Purpose
The backstop procurement mechanism addresses capacity needs within the PJM region's electricity grid, targeting resources required to meet demand from data centers and other large loads. The fixed contract term and price cap structure provide cost predictability while incentivizing new capacity development.
Facts 4
| Attribute | Value | Confidence | Sources | Cited |
|---|---|---|---|---|
| Domain | electricity capacity procurement
also reported: electricity grid capacity procurement (low), energy (low)
|
low | 1 | 1 |
| Prime contractor | PJM | low | 1 | 4 |
| Cost | $555 per megawatt-day price cap
also reported: 20000000000 (low), billion-dollar implications for consumers (low)
|
low | 1 | 1 |
| Status | development | low | 1 | 5 |
Participants 5
Frequently mentioned together 5
Sources 5
- PJM’s old way of getting power built isn’t working. Has it found a fix? · Canary Media
- FERC chair slams PJM ‘mess’ as country’s largest grid operator delays power auction · Utility Dive
- PJM files backstop auction plan at FERC to meet capacity shortfall · Utility Dive
- PJM’s revised data center backstop procurement plan reduces utility risks: ICF · Utility Dive
- DOE presses PJM on ratepayer protections from large load costs · Utility Dive