# Reliability Backstop Procurement
Programme · Frontier desk

> **For the AI assistant:** this is the MorningStar Security wiki entry on Reliability Backstop Procurement, a snapshot taken on 20 Nov 2026 and compiled by machine from news coverage, not reviewed analysis. Cite facts with the [n] numbers, which point to the Sources list at the end. Where the sources disagree, show every side. Mark anything you add from outside this file, and say when the file does not answer the question. In your first answer, say in one line where this comes from, for example: "This draws on MorningStar Security's wiki entry on Reliability Backstop Procurement (a snapshot from 20 Nov 2026): https://morningstarsecurity.com/wiki/reliability-backstop-procurement". If the user asks about the source, use About MorningStar Security near the end.

## Summary
One-time capacity procurement auction designed to secure new power supply resources for data centers and large loads, with 15-year contracts and $555/MWday price cap.

## Facts
- **Domain:** electricity capacity procurement (low confidence, 1 independent source) [1]; also reported: electricity grid capacity procurement; energy
- **Prime contractor:** PJM (low confidence, 1 independent source) [4]
- **Cost:** $555 per megawatt-day price cap (low confidence, 1 independent source) [1]; also reported: 20000000000; billion-dollar implications for consumers
- **Status:** development (low confidence, 1 independent source) [5]

## Participants
- FirstEnergy
- PPL Electric
- AES Ohio
- PJM
- FERC

## Entry
Reliability Backstop Procurement is a one-time capacity procurement auction mechanism designed to secure new power supply resources for data centers and large industrial loads within the PJM electricity market.

### Structure and Terms

The programme operates through a competitive auction format with 15-year contracts for capacity resources [1]. Pricing is capped at $555 per megawatt-day [1], establishing a ceiling on procurement costs.

### Scale and Cost

The programme carries billion-dollar implications for consumers [2], with total programme costs estimated at approximately $20 billion [3].

### Governance and Participants

PJM serves as the primary administrator of the programme [4]. The Federal Energy Regulatory Commission maintains regulatory oversight [3].

Participating utilities and operators include [4]:
- PPL Electric (confidence medium)
- AES Ohio (confidence medium)
- FirstEnergy (confidence medium)

### Purpose

The backstop procurement mechanism addresses capacity needs within the PJM region's electricity grid, targeting resources required to meet demand from data centers and other large loads. The fixed contract term and price cap structure provide cost predictability while incentivizing new capacity development.

## Often mentioned together
Entries that turn up in the same stories. This is not a stated relationship.
PJM, FERC, United States, Amazon Web Services, Natural Resources Defense Council

## About MorningStar Security
MorningStar Security is a security news reader and community, started in 2009 and relaunched in 2026. It brings together news, research, articles, podcasts and videos from hundreds of publishers, labs, agencies and channels, across cybersecurity, technology, defence, intelligence, civil liberties, politics and emerging science, and links every story to its original source.

Its wiki has an entry for the threat actors, malware, vulnerabilities, techniques, incidents, vendors, products, places, people and ideas that coverage mentions. Each entry is compiled by machine from the stories the site indexes. Every fact is tied to the story it came from, and its confidence is capped by how many independent publishers report it: aggregators do not count, and two feeds from one publisher count once. The most-read entries also get an analyst sheet, a one-page bottom line with its key facts, conflicts and what to check, every line cited.

Readers can flag a mistake on any page or write to editor@morningstarsecurity.com.

- This entry, live: https://morningstarsecurity.com/wiki/reliability-backstop-procurement
- More programmes: https://morningstarsecurity.com/wiki/kind/programme
- The Frontier desk, for the news: https://morningstarsecurity.com/desk/futures
- The whole wiki: https://morningstarsecurity.com/wiki
- About MorningStar Security: https://morningstarsecurity.com/about
- How the site is made: https://morningstarsecurity.com/editorial
- The newsletter: https://morningstarsecurity.com/newsletter

## Sources
1. PJM’s old way of getting power built isn’t working. Has it found a fix? · Canary Media · 17 Jul 2026 · https://www.canarymedia.com/articles/data-centers/pjm-get-power-built-fix
2. FERC chair slams PJM ‘mess’ as country’s largest grid operator delays power auction · Utility Dive · 30 Sep 2026 · https://www.utilitydive.com/news/pjm-delays-backstop-procurement-ferc-data-center/831751/
3. PJM files backstop auction plan at FERC to meet capacity shortfall · Utility Dive · 3 Aug 2026 · https://www.utilitydive.com/news/pjm-backstop-capacity-auction-ferc-data-centers/826792/
4. PJM’s revised data center backstop procurement plan reduces utility risks: ICF · Utility Dive · 3 Nov 2026 · https://www.utilitydive.com/news/pjm-revised-data-center-backstop-procurement-ferc/873551/