Moss Landing battery facility
300 MW/1,200 MWh grid battery in California, destroyed by fire in January 2025, suffered second fire during decommissioning in September 2026
- Type
- data-center 1 source
- Location
- California 1 source
- Status
- damaged 1 source
- Capacity
- 300 megawatts / 1,200 megawatt-hours 1 source
A 300 MW / 1,200 MWh grid-scale battery energy storage system operated by Vistra in California 1.
The facility functions as a data-center-class energy storage installation 1. It experienced a significant fire incident in January 2025 that resulted in damage to the facility 1. A second fire occurred during decommissioning operations in September 2026.
Facts 5
| Attribute | Value | Confidence | Sources | Cited |
|---|---|---|---|---|
| Type | data-center | low | 1 | 1 |
| Operator | Vistra | low | 1 | 1 |
| Location | California | low | 1 | 1 |
| Status | damaged | low | 1 | 1 |
| Capacity | 300 megawatts / 1,200 megawatt-hours | low | 1 | 1 |