Open in the consoleIts links, as a graph
Export
Irish data center demand reductions
/wiki/irish-data-center-demand-reductions
The link always opens the latest version of this page.
Ask an AI about it
Open in ChatGPTA new chat that reads this entry from the site Open in ClaudeThe same, in Claude
Sending this to someone?
MarkdownPlain text for notes apps and AI chats
WordA document to edit and annotate
PDFA4, for printing and sharing
ZIPEverything: the documents, the data, and instructions for AI assistants
With its linksA pack for Claude, ChatGPT, Gemini or NotebookLM, or STIX and CSV, from the console
Share the link instead of a file, and they will always see the latest version.
Files are a snapshot of today. The live page has anything newer.
stub ·
1 feed
Irish data center demand reductions
Four major 220-kV transmission events with data center load shedding: 74 MW (Jan 2022), 204 MW (Dec 2022), 321 MW (Jan 2025), 387 MW (May 2025)
Snapshot
- Impact
- Four events: 74 MW (Jan 7, 2022), 204 MW (Dec 13, 2022), 321 MW (Jan 26, 2025), 387 MW (May 8, 2025) 1 source
Intelligence coverage
Four major 220-kV transmission events with data center load shedding: 74 MW (Jan 2022), 204 MW (Dec 2022), 321 MW (Jan 2025), 387 MW (May 2025).
Drawn from 1 news source; the facts and relationships below show where each detail comes from.
Facts 1
| Attribute | Value | Confidence | Sources | Cited |
|---|---|---|---|---|
| Impact | Four events: 74 MW (Jan 7, 2022), 204 MW (Dec 13, 2022), 321 MW (Jan 26, 2025), 387 MW (May 8, 2025) | low | 1 | 1 |