Has the Pentagon LOST BILLIONS in F-35 parts?
Transcript
Machine-transcribed by YouTube. Expect errors in names, commands and version numbers.
Has the Pentagon straight lost track of billions of dollars worth of F-35 parts? Have F-35 parts just walked off the assembly line to find themselves in the hands of American adversaries? No, not really. But recent headlines might have you convinced otherwise. So, let's talk about this new report from the Government Accountability Office, how it's being interpreted online by people who didn't read it, and what it actually says. I'm Alex Hollings and this is a really shortfused edition of Air Power.
>> No ad today, guys. Just a reminder to download the Sandbox News app for Apple and Android today. It is totally free and includes all of our long and short form videos and also incredible written analysis from our team of subject matter experts. There are already 13,000 of you
guys using our app every day and I could not be more grateful for the support. Okay, now let's talk F-35 parts. Today you might have seen a lot of headlines saying things like Pentagon can't track thousands of F-35 parts or more than 1 million F-35 spare parts remain missing or Pentagon can't track millions of F-35
parts. And with sensational claims like that coming from pretty respectable defense outlets, you can rest assured that we'll see even more hyperbolic takes from less reputable content farm outlets before this day is through. Which is why I'm rushing to get this video out to try to nip some of that disinformation in the bud. These headlines are all based on a new report called DoD needs to strengthen oversight of tens of billions of dollars in parts, which itself is really something of a follow-up to a previous GAL report called DoD needs better accountability for global spare parts and reporting of losses worth millions. Now, that report was published in May of 2023. And right off the bat, you might notice that these titles both place a much heavier emphasis on what seems to be accounting than the potential intelligence value of all those lost parts. And that should be your first clue that this story is being misrepresented by a lot of media outlets and social media posts alike. And this is one of those rare situations where my background in autoracing actually comes into play. You see, one of several roles that I had over the years in racing was that of a parts coordinator responsible for maintaining all the inventory we needed to keep a fleet of around 60 Formula Dodge RT 2000 race cars running.
Now, every individual nut, bolt, and even the stickers on or in these cars all came with a four-digit part number. I still remember a bunch of them. A clutch was a 5400, a muffler was a 4600. And as I packed and shipped parts to different racetracks around the country for different races, I would use those part numbers and the quantity I pulled to digitally shift those parts from our local inventory to the inventory of the parts trailer that was on site. But maintaining a massive inventory of thousands of different parts is tough. And it's even more challenging because the people actually fixing or building the race cars or fighter jets see you and your pesky inventory control processes as nothing more than an unnecessary hurdle between them and finishing their work for the day. If I gave the tax a part off the shelf that proved to be defective for some reason, well, that mechanic could come to me with the part and say so, and I would make a record of the issue, pull that part out of active inventory, and send it back to one of our specialists or contractors to either rework or replace it. And this is important because the GAO or government accountability office includes accidental damage or destruction of parts in its definition for inventory losses. Meaning that saying something is lost in a GA report does not necessarily mean it's unaccounted for. And we'll talk more about that in a minute. Of course, going through the correct process to get a replacement race car part meant coming to find me in one of the two big inventory buildings, spending a few minutes explaining the situation, and then asking me to go get you a new part, which might take some time if I had more pressing issues to deal with. And let's be honest, we all know that it would be a lot easier and a lot faster to just set that defective part aside, walk over to the racks with parts that I had already pulled, logged, and set out for a different car, and just grab yourself a good clutch to put in the car that you're working on right now. You could get that car done that much faster. And finding another clutch for the next car, well, that just sounds like a problem for that pesky parts guy to deal with in the morning. Now, F-35s are obviously built in much more rigid and controlled environments than race cars, but I gave you that simplistic example to help you understand the way inventory control procedures often seem counterintuitive at best and downright inconvenient at worst for the people who are actually doing the job. And as a result, human beings tend to find creative ways to work around them to save themselves some time and a bit of annoyance. And that brings us back around to those GAO reports, which when you actually read them, identify some $85 million worth of F-35 parts that one contractor alone recorded as lost, damaged, or destroyed from the global pool of spare parts maintained across more than 700 facilities around the world. But even more importantly, the GAL goes on to assess that the F-35 joint program office itself is not maintaining its own inventory accountability record of these parts. That doesn't mean these parts vanished. The contractors had records identifying these losses. And again, losses in this context includes parts that were damaged or destroyed. The problem here is that the Pentagon has not maintained a complete independently verified accounting of those parts. And to date, it seems to lack a reliable way to track whether each of those losses has been formally reviewed and resolved.
The issue wasn't that a million parts had vanished from inventory. In most cases, it was the adjudication process that I described as a mechanic bringing me apart and explaining the issue. When an F-35 part goes missing or is damaged,
the contractor identifies the part, investigates what caused that damage or the part to go missing, and then prepares a corrective action plan to prevent any of these issues from happening in the future. And then it turns that over to the Defense Contract Management Agency or the DCMA to adjudicate that loss, which effectively means assessing the claims made by the contractor, determining financial liability or who's to blame, and then adjusting topline inventory levels to match contractor records. Now, at the time of the first report back in 2023, there were 940,000 individual F-35 parts still waiting to be submitted for that adjudication process in the F-35 spares pool. Now,
that means the contractors had identified these part losses, again, including parts that were damaged or destroyed, and had accounted for them. But the DoD had yet to review and confirm their reports or update their topline inventory records to match. The GAW also identified instances of contractor loss reports not being submitted within required timelines. Some government facility loss reports didn't include the proper unit cost for the parts, and some were submitted via the wrong reporting mechanism. Now, I recently toured the F-35 production line at Fort Worth, Texas. We'll have a video about it soon. And I learned a bit about the Loheed Martin approach to inventory control while I was there. Each individual component isn't just logged.
It's traced back to which of more than 2,100 individual suppliers that it came from and is allocated to a specific aircraft build long before the jet even starts taking shape. Each aircraft has a serial number and even a customer as in a nation shown prominently on its fuselage as it makes its way down the mileong assembly line. And each individual part has already been pulled, logged, and tied to that specific airframe before it's installed. Now, that's not just important for inventory control, but also for assessing quality issues that might surface because of manufacturer errors, changes in the assembly process, poor training, or even employee malpractice. When a part proves to be a problem, it doesn't fit properly or it's damaged, Loheed Martin wants to know if that's an anomaly that just managed to sneak past quality assurance or if it's a symptom of a larger problem that could lead to delays in aircraft deliveries or much worse. And that is a big part of why inventory control is so important. And make no mistake, these GAW reports do highlight serious problems that need to be addressed.
There is no question there. But submitting reports late, leaving fields on a form blank, or submitting your report via the wrong system points toward administrative improvements that need to be made rather than a complete lack of inventory accountability. Maybe the biggest issue, as identified in the newer report, is how the F-35's Enterprise Logistics Management System or ELMS cannot directly interface with the inventory management systems that are employed by government contractors maintaining these parts. And as a result, contractors provide quarterly inventory level reports that the F-35 Joint Program Office uses to update the figures it's got in Elms, sometimes without thorough validation of their own. And that quarterly cycle leaves the Pentagon's inventory accounting lagging behind by 3 months or more. Now, like
the branches of the military that keep failing audits, aside from my beloved Marine Corps, today is after all the Marine Corps's birthday, the broader issue generally isn't not knowing where the money or the parts went. The issue isn't necessarily that the money or equipment is physically missing at all. It's that the government cannot produce a complete, accurate, and independently verified record showing where everything is and what it's worth in real time. There are very likely parts that have genuinely gone missing with more than $31 billion worth of inventory distributed across again some 700 F-35
facilities around the world. And that is exactly why it is important to highlight the shortcomings in the program's inventory control procedures just as the GAO has done in these reports. But it's also really important to keep in mind that not all parts, even for an aircraft like the F-35, represent super secret aviation technology that Chinese spies are cutting fences to get their hands on. Nuts and bolts are still nuts and bolts. And as the GAO itself points out in this new report, approximately $17,000 F-35 parts valued at roughly a combined
$1.3 billion were indeed missing from the government's official inventory upon inspection, despite those parts being listed as in maintenance or repair status in the contractor records. From the standpoint of the F-35 Joint Program Office and the Gaus auditors, that means these parts are missing, representing more than a billion dollars out in the wind because they were not accounted for properly.
They were accounted for by the contractor, but those records were not reflected at the federal level. And that is a problem, even if it's not an actual billion dollar hole in the program's bottom line. As the GAO highlights in the new report, one contractor's entire inventory management system received a disapproval rating specifically because it didn't maintain its records in a proper auditable format. Now, Twitter or
X or whatever you want to call it user Aaron Cowan actually replied to me this morning with a very succinct breakdown of what I'm trying to explain. So, rather than flounder with it, I'll quote him directly. We don't have audit compliant traceability is different than the DoD lost X episode 9,999.
It feels like we have this conversation every year the audit comes out and still every major media outlet won't distinguish between the two. Having everything written down in a log book, a spreadsheet, or a local database doesn't count. The data needs to be recorded properly in the proper places and various disperate systems in order to pass an audit. And those auditing procedures exist specifically to make sure inventory control is as rigorous as it needs to be. That is to be very clear
once again super important from a financial accountability and an inventory security standpoint. But it is not as simple as F-35 parts or in the
case of those military audits, trillions of dollars just vanishing into thin air. In many cases, it's more like this stuff was accounted for on this spreadsheet, but it was actually supposed to be accounted for on this other one. Now, I can attest from standing my own audits and inspections as a regimental personnel chief during my days training reservists on INI duty. When the MACT inspectors stroll in, it did not matter if you have all the numbers they ask you for if those numbers aren't recorded in the right places using the right formatting and recorded in a way that demonstrates historical adherence to procedure. often that even kept us from being able to digitize our work because the audit requirements at the time mandated physical documentation. So just showing proper payments to Marines on a screen did not count. We had to have a printed package with penstrokes on it proving that we had ensured those payments were accurate whether they were or not. Again, this is not me saying that we can ignore these inventory issues with the F-35 Joint Program Office, the DCMA, Loheed Martin, or any
of its subcontractors. I am not excusing any individual or systemic failures in this inventory control process. And I am not telling you to dismiss the Gaus findings as hyperbolic themselves. What
I am trying to do is show you how easy it can be for parts to go missing on paper without being lost. For inventory records to be inaccurate or incomplete, even when the inventory is actually accounted for, and why fixing these problems can be really hard. The truth is, the problems identified by these Gal reports could absolutely lead to serious
security breaches or even financial fraud. But the GAO is not arguing that either of these things has happened already. It's arguing that the inventory control procedures in place are not robust enough to make sure those things can't happen. And that is a big deal. There are real problems here. They're just a lot more boring and a lot less damning than a lot of headlines and social media posts would have you believe. You are always going to drive more clicks as an outlet or a journalist with a headline saying the government can't account for $31 billion worth of F-35 parts than you ever will with a headline that says government inventory accounting system lags behind contractor databases due to poor administrative reporting procedures. Heck, I'm a journalist who's got bills to pay. So, when I get to making the title and the thumbnail for this video, I'll probably lean a bit into that framing, too, just so anybody will actually click on this video. But at the end of the day, it's the boring stuff that tends to matter most when it comes to passing an audit or winning a war. Amateurs talk strategy while professionals talk logistics. But it's the beam counters who make sure everybody gets paid. And like it or not, that's really important. And with that ends this very shortfused edition of Air Power from Sandbox News. I'm Alex Hollings. Make sure to download the Sandbox News app today. It is live for Apple and Android devices. And again, it's got all of our video content and tons of incredible written analysis along with a bunch of other free goodies. Again, the app is totally free.
Now, if you got anything out of today's video or you just want to tell me how wrong you feel like I am, make sure to click like and then leave your comment down below. and then, you know, leave me another comment about what I should cover next. And of course, don't forget to tap on that bell icon so you never miss a drop from Sandbox News.





