06:00 UTC Charta Aetatis Cyberpunk

Console Newsletter Pro Sign in Early access Register
Aa · Display
Themes
Type size
Density
Space Futures · NASA · · 2:05:14 runtime

Artemis Acceleration (Oct. 23, 2026)

In the wiki ArtemisNASAVehicle Assembly BuildingSpace Launch SystemOrion spacecraft Also namedApollo Project
Transcript 7150 words

>> For over 250. >> Years, America has led an inspired. The world with our accomplishments.

[MUSIC] Our leadership in space by the pioneers of decades past. All

happened because of the brave men and women that made the decision to take on being credible. The near impossible challenges and succeed. That is

our mandated NASA. And I assure you, we are not slowing down.

>> Good afternoon, and welcome to NASA's Kennedy Space Center in Florida. I'm George Alderman, NASA's deputy press secretary. We're here today to share a series of updates on NASA's ongoing work to accelerate the Artemis program, including the progress we're making towards next year's Artemis three mission and the Artemis and the Artemis four mission that will return American astronauts to the moon in 2028. Today, you'll hear from NASA Administrator Jared Isaacman, NASA associate administrator and chief engineer Amit Shah and Artemis program manager Jeremy Parsons. Following these presentations, we'll have the opportunity to answer questions from the media in the room and over the phone. But before we hear from our presenters, we're first going to bring you live to the Vehicle Assembly Building, just across the road from us here at KSC to hear and see our progress on assembling the Space Launch System rocket for next year's Artemis three mission. Over to you, Megan.

>> Thank you George. And yes, welcome into a very busy VAB here where crews are actively working on the core stage. You see right behind me. Of course, the core stage, the backbone of NASA's SLS >> Rocket. This one in particular will fly NASA's Artemis three crew. Really? Just stop to think about what I just said for a moment there. Just six months ago, we launched Victor Reid, Jeremy, and Christina around the moon with Artemis two. And now here we are a short time later, about to assemble the rocket that will fly the next. Really impressive stuff. Now let's keep walking here, the core stage. Let's take a closer look about the length of a 20 story building nearly 28ft in diameter. It stores more than

733,000 gallons of super cold liquid hydrogen and liquid oxygen and all the systems to feed those propellants into the four Rs 25 engines you see there. It's currently horizontal in the transfer aisle because teams are currently in the process of moving it around in the VAB. Just yesterday it was vertical. In Highbay two, we actually snapped some pictures as teams skillfully pulled it up and out of the high bay, and then lowered it into the transfer aisle and laid it on its side. And now what you're seeing are teams currently weighing it. Engineers need to know how much it weighs to be able to calculate a flight design. Next week. Teams will get it vertical again, this time in high Bay. For to connect it with these two solid rocket boosters, both boosters were fully assembled earlier this month, and once integrated, teams will do final checks before rolling everything out to launch pad 39 B to practice fueling the rocket again, a really huge milestone for teams supporting all of this work. It speaks to their commitment to the schedule and all of our goals as an agency. Artemis three, set to launch next year, will send four astronauts to low earth orbit to practice docking their Orion spacecraft with two commercial test landers that could ultimately land people on the moon with Artemis four. To talk more about all of our ambitious goals, let's send it back across the street with Administrator Isaac Ben.

>> Well, that is great. Thank you so much for beginning my remarks. I mean, how impressive is that? I'm just so proud of the entire NASA workforce, Jeremy, especially your team. I mean, we're talking a handful of months ago that Artemis two just launched and came back and look at all the amazing progress you see on the vehicle for the next mission. So with that, good afternoon. Good afternoon. It is my great pleasure to welcome you all back to Kennedy Space Center for an update on the Artemis program. Again, I want to express my appreciation, my thank yous, to the workforce here at Kennedy and across NASA, our industry and our international partners who are making everything we are about to discuss today possible. Now, let us go back in time. Bear, bear with me. All for a little bit. Some 58 years ago, it's

October 1968 and just hours ago, the Apollo seven astronauts splashed down from the first crewed mission of the Apollo program. Now the Saturn V for Apollo eight. It's already assembled. It's out at Launch Complex 39 A, and in less than two months, that mission is going to fly, sending Frank Borman, Jim Lovell and Bill Anders into lunar orbit in the Vehicle Assembly Building. The Saturn V for Apollo nine is already waiting. The lunar module, the Lem for Apollo ten, it's already been delivered. And in the midst of all of that mission activity I'm describing nine months from now, the eagle is going to land, and Neil Armstrong and Buzz Aldrin will walk on the moon. Now, of course it is. It is no secret that NASA was playing our part in a rivalry between two superpowers. It was a different time with extraordinary national resources committed to that objective. But we also knew so very little, with so little technology to aid in our efforts and no experience operating at all beyond low earth orbit. And yet, in that remarkably short span of time, the ambitions of generations once confined to the pages of science fiction became humanity's greatest achievement.

And for the first time in billions of years, life born on earth would set foot on another world. And here we are today, very much in a new space race. And despite decades of accumulated knowledge and extraordinary advancements in technology, this race will be much closer than it ever needed to be. And why is that? I mean, China achieved its John Glenn moment, its first solo orbital human spaceflight just 23 years ago. Now, at that point, not only had NASA won the first space race, we put our astronauts on the moon six times, and at that point, we had flown 113 space shuttle missions before China had put their first astronaut in space.

And from there, in 2003, a Chinese space program, once in its infancy, has since deployed hundreds of communications satellite earth observation satellites, military satellites. They've developed autonomous lunar landers and rovers. They've returned samples from the far side of the moon, and they're preparing alongside Russia to build a moon base of their own. Now, China will soon have reusable rockets. They have spacecraft and landers and an infrastructure for a credible two launch architecture to put their astronauts on the lunar surface in the next three years. Now, this is a story as much about their discipline, focus, and urgency. It is about the weight of institutional inertia and misplaced priorities and decades of decisions, some imposed upon us and others of our own making that have held America's space program back.

And that brings us to the moment we find ourselves in today. Because the appetite, the appetite for tolerating and defending the status quo has reached its conclusion. No longer will we create programs that are too big to fail and too costly to succeed in the hopes of trying to make everyone happy. We will not compromise our architecture, performance, or capabilities to accommodate the the lobby of suppliers or to preserve technologies. Time has passed. We will not allow layers of process and bureaucratic inertia and endless deliberation take precedence over engineering progress and getting hardware built and flown. We will not outsource our expertise anymore, and we will not delude ourselves into believing that more time, more money, and flying less will somehow make our work safer or more achievable. We are here for the mission and to deliver the outcomes the world expects of the most accomplished space agency in history. And what I am describing this is this is not some long overdue disruption. It's not entrepreneurial thinking or tech tech industry, pixie dust or or some new management philosophy. It's about our own history. It's a playbook this agency knows really well. The same playbook that went from Apollo seven splashdown to Apollo 11 in just nine months.

And as extraordinary as those achievements were, they should not represent the upper limits of what NASA is capable of. But the standard that we should continuously aspire to exceed, which is why we are bringing that intensity, that discipline, that engineering ownership back to NASA, because great natis do not remain great by being caretakers of history, but by continuously making history. So soon you're going to hear from NASA's associate administrator and chief engineer Trisha, and leader of the Artemis program, Jeremy Parsons. And they're going to tell you what we have gotten right. They're going to tell you what we've gotten wrong and the extremely hard work ahead on America's return to the moon, because confronting our shortcomings and doing something about them is how confidence is earned.

It's how cultures are changed, and it's how the might of a great space agency is once again unleashed. Ahmed and Jeremy will talk to you about the Artemis three hardware being assembled right here at Kennedy Space Center. What's on track? The absolutely outstanding performance of the workforce that has cut the assembly and integration schedule in half, and the work ahead toward a year end tanking test and a summer 2027 Artemis three launch. And when Artemis three does fly next year, we will have exercised those big rocket muscles that we will have strengthened and in the process, bring together the three three of the world's most powerful rockets, alongside the Orion spacecraft and the two human landing systems in development. To test the interoperability and capabilities we're going to need before the next mission, they will talk to you about Artemis four and the optionality we are preserving to give both of our lunar landing partners the greatest opportunity for readiness in advance of astronauts landing on the moon in 2028. And we have no intention of surrendering a viable path to the surface before the data and schedule compels us to do so. You will learn how the moon base missions, especially Blue Origin's New Glenn rocket and Mark one landers share important commonality with the transfer stages and crewed landers that will follow. These missions will do far more than lay the first kind of figurative brick of of America's moon base. Every mission is going to provide invaluable engineering data, reduce risk, and build confidence in the crewed landings ahead. And when American astronauts do take their first steps on the lunar surface in 2028, a rover and the first elements of an enduring human presence on the moon will already be waiting for them. So like the space race of the 1960s, we are hardly in a position to set it and forget it. With respect to our planning, we will never stop listening to data and adapt as circumstances require.

Just as we did during Apollo and or just as we did during Gemini, and just as we did during Apollo. Now that means simplifying and dramatically reducing the mass of our lunar spacesuits means improving our upper stage performance to get Orion closer to the moon and modifying Orion to accommodate different lander requirements. Now, in this incredibly demanding and dangerous business of putting astronauts on the moon, NASA must own the near impossible. Rather than shifting the burden to our partners. That is how we get. We give Artemis for the greatest possible chance of. Safely and successfully returning Americans to the lunar surface in 2028. And to be really clear, there are serious engineering challenges ahead. Getting Orion to low lunar orbit means solving propulsion and spacecraft integration problems that were left unaddressed for far too long, advancing two very different landing systems requires demonstrating capabilities ranging from complex launch campaigns, large scale cryogenic prop transfer to the to the aggregation of stages in orbit. These are not trivial matters to solve, and no amount of of my enthusiasm or schedule pressure changes the laws of physics. What we are undertaking is ambitious.

It's extraordinarily difficult, and years of decisions both within and beyond the walls of this agency have cost us time and resources that we never had to spare. But the agency we are reinvigorating and the extraordinary vehicles our industry partners are building are worth every bit of that effort. This will not be a repeat of the flags and footprint footprints. These vehicles are being designed to dramatically reduce the cost of delivering mass to orbit and to the moon to support longer surface operations, enable more frequent astronaut missions, and transform what will begin as a small scientific outpost into something that May 1st day resemble a city on the lunar surface. This mountain of effort is our opportunity to potentially spark a lunar economy, to unleash scientific discovery, to learn, to live and work beyond our home planet and mature the technologies we will need for the day. When NASA astronauts embark on humanity's next giant leap to Mars. And we will never compromise on testing and qualifying the hardware that our astronauts and, frankly, America's space program depends upon, and we will never launch until we are ready. But we will not accept that great achievement, simply require more time and more money. Nor will NASA sit idly by and watch one of the most consequential moments of this new century past our overseas competitors.

We are rebuilding the workforce and core competencies that eroded over decades. We are restoring our ability to design, build, test and fly hardware our missions and industry partners depend upon. We are deploying talent from across NASA centers and throughout the supply chain to attack the critical path. Every vendor and partner should understand that when a schedule is broken, NASA personnel will be knocking on the door and not to observe, not to write a paper or convene a committee, but to roll up their sleeves and solve problems. This is what extreme ownership looks like and the capabilities we are rebuilding today will serve America long after the first astronaut Artemis astronauts returned from the moon. This is a very energized NASA, and the updates you hear today are only a small part of that story. I am beyond proud of how the team has responded since our ignition event earlier this year, and you can see it here at Kennedy in the in the Vehicle Assembly building, in our machine shops that are running around the clock across our centers and throughout our industry partners, because there is, of course, much, much to do. And that brings us to where all of this began, when the men and women of this agency were in the home stretch of a great race, with extraordinary challenges still ahead, we find ourselves at a similar moment under very different circumstances, with perhaps even more at stake. And just as the Apollo generation rose to the occasion, so too will the young engineers that are working late at night right now on Orion, the welders that are helping to modify Centaur and the mobile launcher, the technicians that are in the machine shops, the flight controllers preparing for Artemis three, and the intern getting that first glimpse of what it means to be part of NASA, the work they do from here, the obstacles they overcome, the culture they create and the agency they reinvigorate will make possible the dreams of tomorrow. And my hope is when the history books look back on this time, the politics over which Rocket and Landers carried us to the moon, how long it took, and at what cost will be a footnote compared to all that followed that when the time came, the Artemis generation chose to go and we went and thank you. And now I'll turn it over to associate administrator and chief engineer Amit Shastri.

>> Thank you sir, you guys can hear me. Okay. Okay. So hard to follow. But I'm here kind of. Jeremy fortunately is going to take most of this, but I just one thing I wanted to do here is connect the vision. You just heard the inspiration, the the fire that Jared just gave us and kind of serve as a bridge between that and the technical progress that Jeremy's going to talk about. But before I do that, I want to make sure that we really recognize the NASA and all of our partners that have gotten gotten us up to this point in particular, you know, we stand on their shoulders and what what our plan is to is to unleash them.

I want to talk a little bit about Artemis two. You know, I imagine most folks are reasonably satisfied with the result of Artemis two. We just a couple of statistics I just got just for for fun for the rocket itself. Again, magnificent piece of engineering for for a for a experimental vehicle. Orbital insertion 99.987 accurate at

27,227.75ft per second. So we missed it by 3.65ft and then

apogee orbital insertion was at 99.983% accuracy. Preflight prediction was 1200 nautical miles. Actual was 1200 .21. And

of course Orion. I think we've seen you guys recently released the results of the analysis of the Orion heat. And you know, how the mitigations for the for the lofted reentry performed again, you know, the team that flew that mission, everyone around the world, it was was magnificent. But again, as Jared has said over and over again, that's just the beginning. So I want to talk about how we're doing that. You know, it's we we say having these ideas is amazing. But but the implementation is, I think what we all really focus on every day and the execution, but really, you know, and Jeremy's going to talk the details of what's going on with the machines. He's got it, got it down pat. But I think it's important that we talk about the strategic arc that was concurrent while, you know, in in 2026 that's been going on inside of the agency, which is going to enable us to achieve these things. So there are four major things I think that are important to discuss, and they've been publicized separately. But it's important when you see them together. You know, Jared mentioned before, extreme ownership is is our mantra. And you know, when when he came in, I think we established that very clearly with the workforce, with, with, we have to own our mistakes as well as our failures. And when we talked about Starliner, that that was really, to me the reason why we did that. We had we have to we had to set that tone for our workforce, that our expectation is that you guys are amazing, but at the same time, we have to own these results. They belong to us. The second part of that arc was, you know, this workforce we have, we have transformed the way we think about the NASA workforce. We have brought more folks in. We have reestablished where our competencies are. We have defined what we believe.

It means that working for NASA and what those skills need to be, we want to make. We made it awesome to want to work for NASA again. That was the second part. And then, you know, it was about choices. You know, as Jared mentioned, for for years we have been asked to do more than we can and we have to centralize. And we have we had to focus and we had to pick the things that not only were achievable, but also would help us advance and establish NASA in the position where it is in the in the in the spectrum of where the entire space industry needs to be, which is in the front, doing the hardest things, always pushing on, always pushing the envelope. And that's, that's what ignition was. That's really what ignition is. We made choices.

And then after that, we organize ourselves around those choices and how we were going to execute those missions. And in between that too, we flew for people around the moon. So we're here to talk about Artemis specifically. But again, you know, my mandate also is to think about the entire workforce. And I think it goes without saying, you know, this incredible workforce that did the Apollo missions also hit 175 years. Planetary window, did power descent on Mars, flew great observatories, did all those things at the same time we were doing those things. So this excellence, these competencies that we're trying to reinvigorate are we want to reinvigorate them across the board. But again, we stand on their shoulders. But for Artemis in particular, I think it's important, again, take a little bit of a step back because there's been a lot of discussion, as Jared said, about, you know, is this are these new ideas that we've been talking about? It's a new environment, it's a new alignment. It's a new, new sense of energy. But the ideas are ones that we we have contemplated. But now again, we're able to unleash them. So, you know, those of you here in the room, I know a lot of you guys are veterans of the program. You understand kind of how we got here. You know, a lot of the machines that we're showing you today were first envisioned. They were they were envisioned mostly to maintain capabilities, right?

Capabilities that were going away that were potentially needed for the supply chain, etc. That was the point. You know, we designed these these things to maintain those capabilities. But at the same time, there was not a mission focus for those for those machines. We got one in the first administration of our president. He gave us the mandate to go go back to the moon to do Artemis. And that that mandate has continued to today. But, you know, really the capability focus, the way we were organized that still endured, I would say, all the way through the first test flight of Artemis, you know, we were we were doing everything we can to get this vehicle together. And then when we flew that mission, we learned a ton.

But what we also really learned was that, you know, a couple of things. We need to organize ourselves better as a program. We need to align ourselves around what the, what these missions needed to look like going forward. And then we also revealed some of the limitations of the capabilities that we had fielded. So the agency organized itself as a program. I was asked to, to serve as the first manager of that program. And very quickly, I tasked the team. This is in 2023 that we had to realign where we were a realign the capabilities where we were, and really think very hard about the architecture, how it was, how it was, how brittle it was or not brittle, how the, how our contracts were, were aligned in terms of how we're incentivizing these machines have been acquired, been acquired over a 20 year period.

And, you know, many different tranches. And then how to address our production risk across across the entire enterprise. We're at at best case 50% of where we need to be in terms of our ability to crank this hardware out. And so we start, we had a bunch of sessions with all of industry starting in the summer of 2023, where we contemplated all of these things and the limitations of the data we got from Artemis. One of the performance of a lot of the different elements and how they were doing, were they going to converge together to meet together for a mission? And in those cases, did we have the right reliability? Did we have the right rate in order to achieve these goals? And I had to tell you, you know, we had been talking about this and, and iterating on these on these ideas for, for about 18 months until we got deep into Artemis two preparation. And so at that point, you know, we had, we had had we had thought about different orbits for rendezvous.

We had thought about alternate stages. We had thought about ways to configure using the assets we had in order to, to maybe perform missions in Leo or in or in different orbits in order to really achieve these objectives. What we did and the philosophy we took is the same philosophy that Jared just mentioned, which is we took the Apollo approach instead of thinking about these these missions as just all up missions, we thought about them as a series of integrated test objectives, and then we spread them out over the activities. We were trying to do both ground test and in-flight test, and the all up test that we call the Artemis missions and try to figure out how we're going to incrementally get to the right spot. So we could do a landing so that each mission was not going to take too much risk, that it would not succeed, but also take enough risk to advance our our progress, which was the Apollo way. So we had that we kind of had that in our brain as we were going to go fly. And then, of course, you know, in the run up to Artemis two, as after Jared joined us as our leader, you know, we came to talk to you guys in February of 2026 as we were having problems at the pad about how we were really going to change the way we were doing this, because we had reached it, we had seen it, the administrator had seen how we were doing business, and we had decided, you know what? We have the support, we have the alignment, we have the we have everything is coming together.

All these things that we had talked about doing, we need to do them. We need to get focused. We need to start thinking about how to make these things work the right way. And so that's what happened in February of 2026, when, when we were in the in the Artemis two launch campaign, you know, we had the ideas, but now we had the power to execute the alignment activities that we had been thinking about doing, you know, and again, the focus again was about focusing on rate, focusing on reliability, not making too many development choices too early, which is why we made the choices we did with the mobile launcher, which wasn't going to converge at that point with exploration upper stage, which is going to be a brand new stage that had to be fielded for a landing. We wanted to move back to a place where we we had confidence in the machines, understanding the rate where we were, but just enough to give us the opportunity to put together missions that made sense. So that was February. But again, you know, when we think about ignition, ignition happened just a month afterwards. That was it was about particular programs. We made ambitious objectives, ambitious ideas about what we need to do, putting focus on the on the future of a of a nuclear NASA, accelerating our timeline to the point in which that aligns with our policies, but also accelerating to a point where we know we can achieve them if we just focus on rate and focus on the things that that we really need to focus on. And but really what it was about was about contemplating what the NASA workforce would need, what needs to be working on what it needs to be working on now, and what we need to build inside the capabilities of the workforce to do the missions that we're going to do that only we can do, which is where we sit in the spectrum of the entire world space community.

So we have to align the way we were trying to align, the way we work on the things we work on. But we also know that you know that and that alignment occurs in those capabilities occur when we recognize that when we when we buy things, when we make things, especially when we make things, when we make these incredible machines, we get, we get something for free. And that's something we get for free is the, is the is a trained, capable workforce that knows how to take risks, that knows how to design new things, that knows how to do the near impossible. That was the goal. The goal is to build that capability for the next 20 years. And so the, the, the insourcing, the realignment, the core competency development, that's what that's what those things are really about. It's about this workforce and about unleashing them and giving them the skills to do those things.

So, you know, again, you've heard a lot of folks probably in my chair before say, we need to do more work. We, our engineers need to smell like math and hardware again. And that's the, that's the idea. But the reality is there's a way to do that too. We can't just snap our fingers and say that that's what we want to do. So let's go do it. We need to get better at this. And so with my with my role now, you know, it's about focusing on how we build what we're building, but also how we build them. What are we doing with our design and construction standards?

What are we doing with our in-house procedures? How are our machine shops and production capabilities aligned towards those things? Are they up and running? Are the machines humming and thinking about the NASA workforce? Not as ten different places where we build things, but as one integrated workforce, one production enterprise that is able to fill gaps when we need to, but also start things ourselves if we need to do that, too. And Jeremy's going to show some great examples of this. So this will help our mission succeed and will help, you know, invest. Just help us realize that we have a workforce that's hungry to build and we need to unleash them. That's what this is. That is what a lot of this strategic arc has been about.

And that's how I think we're going to get there. But there are key enablers in the way we conduct our engineering enterprise to make that happen. So, you know, this doesn't happen. Of course. You know, like I said, we've had these ideas, but what has really aligned here is the support. You know, at first, an invigorated NASA workforce that's invigorated by leadership, the support of our stakeholders in the administration and Congress, the resources and the flexibility they've given us, the clarity of vision that the administrator has given us, and a leadership team that we have aligned around that's ready to prioritize NASA, prioritize one NASA over over everything else.

So that's what's different. Jeremy's going to show, you know, that this is a bit more than just words that we're putting this to practice. I think the performance that you're seeing here in the VAB is, is, is proven, and it's just going to get better. And you know, as I said before, the ideas are important to the vision is important, but it takes courageous and patience to do what Jeremy's team is doing. And that's what they're doing every day. But I would tell you, the most important thing I want to end with, and before I hand it over, is that, you know, the team at NASA, our industry partners and international partners, they've heard the call and they have been open to change. And this kind of change is hard, especially when you when we push as fast as we need to in the race that we're in, it's very it's very hard. But they have been willing to make the hard sacrifices to make this possible. They're the ones they're going to carry this forward. They're the ones that are going to they're going to be here 20 years from now.

They're going to be part of this generation that that decided we were going to do the near impossible. And if we're right, and if these things work, we're going to have a NASA for the next 20 years that will that will continue to be the light that shines on the world, that can help us teach the world how to build a planetary scales, how to build these scales, and how to build these things to stay. And that is the goal. That is the goal of what we're trying to do. And I think that what you'll see is just us getting started here, but these missions are going to are really going to change that.

And I'll hand it over to Jeremy. Before I do, I have to say, you know, Jeremy and I started working together when I joined Artemis after space Station about five years ago, and I have been so impressed with the way he has taken the reins here. He's an incredible leader and he is the right person for this job. We support him 100%, and I just want want you to understand, like the task we have given to him is almost monumental. I certainly, when I was running the program, couldn't get anywhere close to the performance that he's been getting out of it. And I'm just incredibly honored to to hand it over to him. Go ahead. Jeremy.

>> Thank you. And thank you both for your absolutely laser focused leadership. What I will tell you is across the board, the Artemis team have united behind the vision. They're excited about it. And what you just saw with the core stage and the transfer aisle is just an example. Six months ago when we asked the team to go do some of these things, they didn't know it could be done right. And so they're like, oh,

Performed in a way that I cannot be more proud of. So I get to sit up here and represent the thousands of men and women working on Artemis across the country, and I cannot be more proud to do it. But they are sacrificing nights and weekends because they believe in the mission that's been given to them. And it is really an honor to represent their work to you guys today. So within our Artemis team, we have been laser focused on driving progress, really to get to our boots on the 2028 timeline. We're fighting daily to increase the pace and value of our missions. We're strengthening the spaceflight workforce. We're rebuilding core competencies, and we're onboarding the key talent we need in order to achieve these goals. What I'm seeing, and kind of what both the administrator and Amit spoke about, is that these workforce investments are already paying dividends, both in our technical operational foundations, but also in our progress towards Artemis three.

So I'm going to give you a little bit of updates on Artemis three. I will tell you there's been a lot since we last spoke. So it's going to take a little while. Just sit back and I'll let them jump in as we need to. But so so what we're seeing right, is we're using the workforce that we're talking about. We have key personnel embedded at production facilities, at vendors, and we've empowered them with the decision authority to resolve issues. And we're seeing issues resolved in hours rather than days or weeks. And if you know anything about spaceflight hardware, there's always issues. And that time, those hours make a huge difference. And by doing so, we're seeing our processing times cut in half in some cases.

And in more, we've actually reduced our resolution times for Non-conformances by up to 85%. So for Artemis three, as you just saw in the VAB, we have the hardware coming together, the boosters are stacked, the core stages coming together, and all of these pieces are being built, tested and integrated in Florida. Now, so what we're going to move to now is I'm going to talk a little bit about where we've gotten to on Artemis three. It has been a significant few months. We've struck a mission baseline, and as you know, Artemis three is bringing together NASA, SpaceX, and Blue Origin. We're launching three of the most powerful rockets in the world and undertaking what is likely the most complicated launch campaign ever undertaken.

So I'm going to walk you through the concept of operations for this mission. The graphic that will come up on the screen gives you a really good idea of what we're talking about as simply as we can. So we have Baselined, a 14 day mission. So that capability, we can extend up to 17 days because, you know, weather can happen, could delay a launch, things along those lines. But every day of this mission is built around specific tests that reduce risk, give us valuable science, and allows us to test out our capabilities before we go and undertake the lunar landing. The first sequence in this launch campaign is going to be the Blue Origin, launching its Blue Moon test lander. And so as we've talked before, Artemis three is a low earth orbit mission. And so prior to that New Glenn launch, what we're already going to do is we'll have SLS out at the launch pad.

We would have conducted a wet dress rehearsal, and we're going to do everything we can to ensure that that vehicle is ready to go as quickly as we can. After that first Blue Origin launch, the Blue Moon Test lander can loiter for up to a month in orbit. But end of the day, we want to minimize that risk. And so we want to get the crew on orbit and made it up as soon as we can thereafter. Once in orbit, the Blue Origin team will make sure the vehicle is healthy and ready and to support our rendezvous and docking operations with Orion. And just to give you a little bit of a feel, the blue the blue moon lander is going to allow Orion to dock the crew to ingress and carries many of the same systems of the lunar lander well around the moon. Some of those systems, some of the things that we really get to buy down for, for me, first and foremost, is what we call our systems, our environmental control and life support systems. Those are tricky to build. That was one of our big objectives in Artemis two. But we're also going to be testing out our reaction control systems, our tanks, our valves, our thrusters, the articulating solar arrays, active thermal control systems and radiators.

The lunar crew module primary structure, it's the first build of it. It's going to be the exact same for Artemis three and tons of other things, including our software, flight computers and avionics systems, building, testing, and flying. These and Artemis three will help us understand and learn as much as we can from Blue's operations during this flight. It's similar to how we've started to take an evolvable approach between Artemis one and two and now three, and it sets us up for a lunar landing and for the next vehicle in the sequence is going to be the SLS. So we launched Orion into what is what we call an elliptical orbit at 16 by 975 nautical miles. And over the first day, Orion is going to transition from that higher altitude down to about 300 nautical miles.

And that's really about getting thermal stability. Orion was built as a deep space vehicle. And so we're going to have to really manage the thermal environments, which are higher in a low earth orbit. The crew is going to spend the first two days checking out the Orion spacecraft and setting up for proximity operations. During that time, Orion will maneuver down to a 237 nautical mile rendezvous orbit. And that's where we intend to meet the Blue Origin lander on flight day three, Orion performs the first major test of the mission. And this one's going to be a big one. It's the rendezvous and docking with the Blue Moon test lander. This is where we learn how both Orion and Blue systems operate together. Their guidance systems, laser navigation control, communications altogether in real world conditions. Over the next two days, the crew will conduct operations docked with Blue Moon. They're going to open up the hatch. They're going to enter the lander.

They're going to evaluate the environmental controls, the life support systems. We'll confirm that the spacecraft can maintain the right atmosphere pressure. And we're also going to test emergency scenarios, dual vehicle control. And we're going to put our mission control teams through their paces on flight day six. After those operations are complete, Starship launches from Florida. And so Orion will then undock from Blue Moon and adjust its orbit to a 206 nautical mile rendezvous orbit with Starship on flight day eight. The Starship for Artemis three has a docking system that's built onto the nose cone, and it's letting us conduct on orbit testing with a second, very different lander. And if you've seen some of the Starship images, a very large vehicle.

So we want to learn how to control attitude together, how we're going to fly these vehicles together and how we're going to operate. The demonstration with Starship is shorter about two hours. The crew will not enter the Starship during the mission, but it gives us critical data and allows us to really understand the forces of docking, how we're going to push, how we're going to work together. When Starship operations are complete, Orion and crew have the remaining days available for additio

Related videos

Discussion
0 comments 0 from AI Characters · 0 readers
That's Frontier for today

Tomorrow's desk, in your inbox by 06:00 UTC. The week's best stories, every Sunday. The month that mattered, on the 1st.

Drawn from the 538 sources the paper read this month. Text and HTML, one-click unsubscribe, free.

How often
Your desks