Before You Trust an Eval Number, Check What It Measures

A while back I built an LLM-as-judge pipeline to compare two versions of a prompt. The new version scored higher, so we went with it. A few weeks later it was clear the new prompt wasn't actually better. It wrote longer answers, and the judge liked longer answers. Nothing was broken in the usual sense. The pipeline ran, the scores were stable, and the dashboard looked fine. The problem was that I had been treating the judge's score as a result, when it was really a measurement, and I had never checked what it was measuring. That experience changed how I build evals. Most eval setups I've seen since then do measure something. It's just often not what the team thinks it is. This post covers
…